REMOVAL AND INSTALLATION


Pre-removal and post-installation operation
  • Engine Room Under Cover Front A, B, Engine Room Side Cover (Refer to GROUP 51 - Under Cover .)
  • CVT Fluid Draining and Refilling (Refer to .)
  • Engine Coolant Draining and Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement .)
  • Air Cleaner Intake Duct (Refer to GROUP 15 - Air Cleaner .)
  • Battery and Battery Tray Removal (Refer to GROUP 54A - Battery .)


<Vehicles without air cooled CVT fluid cooler>



Removal steps


1.
Water feed hose B


2.
Water feed hose A


3.
Hose joint assembly


4.
Water return hose

<Vehicles with air cooled CVT fluid cooler>



Removal steps


1.
Water feed hose B


2.
Water feed hose A


3.
Hose joint assembly


4.
Water return hose


5.
CVT fluid cooler hose assembly


6.
CVT fluid cooler bracket A


7.
CVT fluid cooler bracket B


8.
CVT fluid cooler assembly