REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Throttle Body Removal (Refer to GROUP 13A - Throttle Body ).
  • EGR Valve and EGR Pipe Removal (Refer to GROUP 17 - EGR Valve and EGR Cooler ).

Post-installation Operation
  • EGR Valve and EGR Pipe Installation (Refer to GROUP 17 - EGR Valve and EGR Cooler ).
  • Throttle Body Installation (Refer to GROUP 13A - Throttle Body ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Air Bleeding from Fuel Line (Refer to GROUP 13A - On-vehicle Service ).





Removal steps


1.
Glow plug terminal


2.
Glow plug plate


3.
Glow plugs