REMOVAL AND INSTALLATION



Pre-removal and Post-installation Operation
  • Under Skid Plate and Engine Room Under Cover Removal and Installation.
  • A/T Fluid Draining and Refilling (Refer to ).





Removal steps


1.
Cooler hose


2.
Hose


3.
A/T fluid cooler assembly


4.
Pipe assembly


5.
Return hose


6.
Return pipe


7.
Hose


8.
Feed hose


9.
Cooler hose


10.
Cooler pipe assembly