REMOVAL AND INSTALLATION



Pre-removal Operation
  • Front Under Cover (RH) and Side Under Cover (RH) Removal (Refer to GROUP 51, Under Cover ).
  • Power Steering Fluid Draining (Refer to ).

Post-installation Operation
  • Power Steering Fluid Supplying and Bleeding (Refer to ).
  • Drive Belt Tension Check (Refer to GROUP 11A, On-vehicle Service - Drive Belt Tensioner ).
  • Front Under Cover (RH) and Side Under Cover (RH) Installation (Refer to GROUP 51, Under Cover ).





Removal steps


1.
Pressure switch connector


2.
Drive belt (Refer to GROUP 11A, Engine assembly .)

>>B<<
3.
Suction hose


4.
Eye bolt


5.
Gasket

>>A<<
6.
Pressure tube assembly


7.
Oil pump assembly


8.
Power steering pump bracket A


9.
Power steering pump bracket B

INSTALLATION SERVICE POINTS



>>A<< PRESSURE TUBE ASSEMBLY INSTALLATION



Place the pressure hose stopper to touch the power steering pump stopper, and install the pressure hose.

>>B<< SUCTION HOSE INSTALLATION



Install the suction hose so that the marking is positioned upward.