REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Upper Cover Removal (Refer to GROUP 13D - Fuel Injector ).
  • Battery and Battery Tray Removal (Refer to GROUP 54A - Battery ).

Post-installation Operation
  • Battery and Battery Tray Installation (Refer to GROUP 54A - Battery ).
  • Engine Upper Cover Installation (Refer to GROUP 13D - Fuel Injector ).





Removal steps


·
Harness bracket assembly (Refer to GROUP 13D - Common Rail )


1.
Emission control equipment hose


2.
Glow wiring harness clamp


3.
Emission control equipment hose


4.
Vacuum pump pipe


5.
Control wiring harness clamp


6.
Vacuum hose connection


7.
Harness bracket

>>A<<
8.
Vacuum pump assembly


9.
O-ring

INSTALLATION SERVICE POINT



>>A<< VACUUM PUMP ASSEMBLY INSTALLATION



caution Check whether foreign materials are not in the oil feed hole, shown in the illustration, of the cylinder head assembly.
Check whether foreign materials such as sealants are not on the inside surface of the vacuum pump installation hole. Install the vacuum pump assembly.