REMOVAL AND INSTALLATION <4N1>
Pre-removal Operation
Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Removal (Refer to GROUP 51 - Under Cover
).
Engine Upper Cover Removal (Refer to GROUP 13D - Fuel Injector
).
Throttle Body Assembly Removal (Refer to GROUP 13D - Throttle Body Assembly
).
Post-installation Operation
Throttle Body Assembly Installation (Refer to GROUP 13D - Throttle Body Assembly
).
Engine Upper Cover Installation (Refer to GROUP 13D - Fuel Injector
).
Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Installation (Refer to GROUP 51 - Under Cover
).
Removal steps
1.
EGR temperature sensor connector
2.
EGR temperature sensor
·
Harness bracket assembly (Refer to GROUP 13D - Common Rail
)
3.
Emission control equipment hose
4.
Harness bracket assembly stay
5.
EGR valve pipe B
6.
Gasket
·
Vacuum pump pipe (Refer to GROUP 11E - Vacuum Pump
)
7.
Emission control equipment hose connection
8.
Emission control pipe
9.
Emission control hose and pipe assembly
10.
Emission control equipment hose
11.
Variable geometry control solenoid valve connector
12.
Variable geometry control solenoid valve
13.
Emission control equipment hose
14.
Emission control hose and pipe assembly
15.
EGR cooler solenoid valve connector
16.
EGR cooler solenoid valve
17.
Harness bracket
>>A<<
18.
Inlet manifold
19.
Inlet manifold gasket
INSTALLATION SERVICE POINT
>>A<< INLET MANIFOLD INSTALLATION
Tighten inlet manifold mounting bolts and nuts to the specified torque in the order of number shown in the illustration.
Tightening torque: 20 ± 2 N·m