Pre-removal operation
- Battery and Battery Tray Removal.
- Engine room under cover front C Removal (Refer to GROUP 51 -
Under Cover ).
- Air Cleaner Intake Duct and Air Cleaner Assembly Removal (Refer to ).
- Engine Coolant Draining (Refer to GROUP 14 -
Radiator ).
- Front Bumper Assembly Removal (Refer to GROUP 51 -
Front Bumper Assembly ).
|
Post-installation operation
- Front Bumper Assembly Installation (Refer to GROUP 51 -
Front
Bumper Assembly ).
- Engine Coolant Refilling and Check (Refer to GROUP 14 -
Radiator ).
- Air Cleaner Intake Duct and Air Cleaner Assembly Installation (Refer to ).
- Engine room under cover front C Installation (Refer to GROUP 51 -
Under
Cover ).
- Battery and Battery Tray Installation.
|