REMOVAL AND INSTALLATION







Removal steps


1.
Propeller shaft assembly (Refer to GROUP 25 - Propeller Shaft .)


2.
Cover


3.
Vacuum hose connection


4.
Connector connection

>>A<<
5.
Electronic control coupling

INSTALLATION SERVICE POINTS



>>A<< ELECTRONIC CONTROL COUPLING INSTALLATION



1.Check that the length of the electronic control coupling stud bolt (A) is within the standard value range.
Standard value: 22.3 to 25.1 mm
2.If it exceeds either of the limits, clean the threads for the electronic control coupling and replace the stud bolt.
Tightening torque: 15 ± 3 N·m