REMOVAL AND INSTALLATION <6B3>



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Change <4B1, 6B3>).
  • Air Cleaner Intake Duct Removal (Refer to GROUP 15 - Air Cleaner <6B3>).

Post-installation Operation
  • Air Cleaner Intake Duct Installation (Refer to GROUP 15 - Air Cleaner <6B3>).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Change <4B1, 6B3>).





Removal steps


1.
EGR valve connector


2.
Water hose


3.
Water hose


4.
EGR valve


5.
EGR valve gasket