Code No. P0193: Rail Pressure Sensor Circuit High Input










OPERATION




FUNCTION




TROUBLE JUDGMENT


Check Conditions
Judgment Criterion

FAIL-SAFE AND BACKUP FUNCTION




PROBABLE CAUSES




DIAGNOSIS PROCEDURE


STEP 1. M.U.T.-III data list



  • Data list reference table (Refer to ).

    1. Item 63: Rail pressure sensor

Q. Is the check result normal?

Intermittent malfunction (Refer to GROUP 00 - How to Use Troubleshooting/Inspection Service Points - How to Cope with Intermittent Malfunctions ).
Go to Step 2 .

STEP 2. Connector check: B-103 rail pressure sensor


Q. Is the check result normal?

Go to Step 3 .
Repair or replace the connector.

STEP 3. Perform voltage measurement at B-103 rail pressure sensor connector.



  • Disconnect connector, and measure at harness side.
  • Ignition switch: ON
  • Voltage between terminal No. 1 and earth.
OK: 4.9 - 5.1 V

Q. Is the check result normal?

Go to Step 7 .
Go to Step 4 .

STEP 4. Connector check: B-51 engine-ECU connector


Q. Is the check result normal?

Go to Step 5 .
Repair or replace the connector.

STEP 5. Check harness between B-103 (terminal No. 1) rail pressure sensor connector and B-51 (terminal No. 70) engine-ECU connector.



  • Check power supply line for open/short circuit.

Q. Is the check result normal?

Go to Step 6 .
Repair the damaged harness wire.

STEP 6. M.U.T.-III data list



  • Data list reference table (Refer to ).

    1. Item 63: Rail pressure sensor

Q. Is the check result normal?

Intermittent malfunction (Refer to GROUP 00 - How to Use Troubleshooting/Inspection Service Points - How to Cope with Intermittent Malfunctions ).
Replace the engine-ECU.

STEP 7. Perform resistance measurement at B-103 rail pressure sensor connector.



  • Disconnect connector, and measure at harness side.
  • Resistance between terminal No. 3 and earth.
OK: Continuity (2 Ω or less)

Q. Is the check result normal?

Go to Step 10 .
Go to Step 8 .

STEP 8. Connector check: B-51 engine-ECU connector


Q. Is the check result normal?

Go to Step 9 .
Repair or replace the connector.

STEP 9. Check harness between B-103 (terminal No. 3) rail pressure sensor connector and B-51 (terminal No. 88) engine-ECU connector.



  • Check earthing line for open circuit and damage.

Q. Is the check result normal?

Go to Step 14 .
Repair the damaged harness wire.

STEP 10. Connector check: B-51 engine-ECU connector


Q. Is the check result normal?

Go to Step 11 .
Repair or replace the connector.

STEP 11. Check harness between B-103 (terminal No. 1) rail pressure sensor connector and B-51 (terminal No. 70) engine-ECU connector.



  • Check power supply line for damage.

Q. Is the check result normal?

Go to Step 12 .
Repair the damaged harness wire.

STEP 12. Check harness between B-103 (terminal No. 2) rail pressure sensor connector and B-51 (terminal No. 64) engine-ECU connector.



  • Check output line for open circuit and damage.

Q. Is the check result normal?

Go to Step 13 .
Repair the damaged harness wire.

STEP 13. Voltage measurement at B-103 rail pressure sensor connector.



  • Disconnect connector, and measure at sensor side.
  • With the special tool test harness (MB991658) bridge only the mating terminals of No. 1 and No. 3 of the disconnected connector.
  • Ignition switch: ON
  • Voltage between terminal No. 2 and earth.
OK: 0.85 V or more

Q. Is the check result normal?

Go to Step 14 .
Replace the rail pressure sensor.

STEP 14. M.U.T.-III data list



  • Data list reference table (Refer to ).

    1. Item 63: Rail pressure sensor

Q. Is the check result normal?

Intermittent malfunction (Refer to GROUP 00 - How to Use Troubleshooting/Inspection Service Points - How to Cope with Intermittent Malfunctions ).
Replace the engine-ECU.