REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Cover Removal (Refer to GROUP 16 - Ignition System, Ignition Coil ).
  • Air Cleaner Assembly Removal (Refer to ).
  • Throttle Body Assembly Removal (Refer to GROUP 13C - Throttle Body Assembly ).

Post-installation Operation
  • Throttle Body Assembly Installation (Refer to GROUP 13C - Throttle Body Assembly ).
  • Air Cleaner Assembly Installation (Refer to ).
  • Engine Cover Installation (Refer to GROUP 16 - Ignition System, Ignition Coil ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).





Removal steps


1.
Manifold absolute pressure sensor connector

>>A<<
2.
Manifold absolute pressure sensor


3.
O-ring


4.
Purge control solenoid valve connector


5.
Purge hose connection


6.
Purge control solenoid valve


7.
O-ring


8.
Control wiring harness connection


9.
Right bank detonation sensor connector


10.
Left bank detonation sensor connector


11.
Control wiring harness and injector wiring harness combination connector




Removal steps


12.
PCV hose connection


13.
Brake booster vacuum hose connection


14.
Throttle body stay


15.
Air intake plenum stay (rear)


16.
Air intake plenum stay (front)


17.
Air intake plenum


18.
Air intake plenum gasket

INSTALLATION SERVICE POINT



>>A<< MANIFOLD ABSOLUTE PRESSURE SENSOR INSTALLATION


caution
  • Install the manifold absolute pressure sensor, taking care not to give a shock to it.
  • Do not use a manifold absolute pressure sensor that has fallen down.